TheNavalArch
  • Home
  • Marine Calculators
    • Maritime Industry
      • Ship Design and Construction
      • Marine Operations
      • Transportation
    • Oil & Gas
      • Subsea Engineering
      • Offshore Platforms
      • FPSO Industry
  • Engineering Service
  • Learning Solutions
  • Blog
  • About Us
  • Contact
  • Login
  • Sign Up
Select Page
Preliminary Rigging Arrangement Design OF 4 point, Single Hook Lifts for Non-Specialists

Preliminary Rigging Arrangement Design OF 4 point, Single Hook Lifts for Non-Specialists

by | Jan 6, 2020 | Lifting Operations, Marine Operations

by Michael Harwood, PE, PMP Overview Lifting by crane is a basic construction operation that dates back to at least Sixth Century BC (ancient Greece for example) and the lifting operation itself dates back much further. It is a very common operation in present-day...

About Us



We are a leading services platform for high-quality online content for the Marine & Offshore industries.

Related Links

  • About Us
  • Contact Us
  • Engineering Services
  • Learning Solutions
  • Blog

Get In Touch

  • 

    Call (61) 432 185 746

  • 

    Email info@thenavalarch.com

© 2016-2022 TheNavalArch Pte Ltd

  • Facebook
  • X
  • RSS

Designed by Elegant Themes | Powered by WordPress