Gap & Sag Alignment
Gap and Sag Alignment is carried out to bring the engine to its final position, in case of directly coupled installations, and to bring the gear box to its final position in case of installations with reduction boxes. The figure below indicates a typical gap and sag alignment set up.
The procedure followed for the Gap-Sag is as below.
The propeller shaft forward end,(only in some cases, not mandatory) is pre loaded down, with a prescribed load at a specific Location.
In this condition, Gap and Sag values as prescribed by the maker are set between the aft flange of the intermediate shaft and the propeller shaft forward flange by adjusting the supports/bearings on the intermediate shaft.
How to measure gap and sag is a question asked many times. Experience tells, it is more accurate to measure using slip gauges and feeler gauges, as the shaft tends to move axially unless it is on self-aligning roller bearings. with thrust collars during rotation.
Once the gap sag is achieved, adjust the main engine/gearbox on jack bolts. (it is to be ensured that the engine/gearbox is supported only at the four corners during the entire alignment process)
Once both sides gap and sag is achieved, surveyed and signed off. the shafts/gearbox/engine are coupled together.
For differences of Gap-Sag between the calculated and achieved values adjustments are made using the Reaction Influence matrix.
For Direct Coupled Engines:
Normally for a direct coupled engine. the intermediate shaft will be supported on temporary supports for alignment. Once the Gap sag alignment is over, the shafts are coupled together with the engine. After this, the pedestal bearing -normally one in number, is lifted up and engaged with the shaft in way of the bearing area, using jack bolts. During this operation, a dial gauge is kept on top of the shaft at 12 o’clock position). The shaft is lifted with the pedestal bearing by 0.01 to 0.02 mm, by reading on the dial gauge. and brought down by the same amount, thereby ensuring proper bearing contact at the bottom.
Once this is done, the following are measured. Template for this, for MAN B & W engines, are attached with this annexure.
- Bearing reaction at Stern tube forward bearing
- Bearing reaction at the Plummer block
- Bearing reaction at the last main bearing
- Crankshaft deflection for the main engine
- Bedplate deflection
Since crankshaft deflection measurement is a common activity onboard operating ships, the same is not being explained in detail.
Bed Plate Deflection:
Bedplate deflection / Sag measurement and acceptance criteria are engine maker and model specific. Given above are the recommendations in this regard from MAN B &W in figure 6(b).
Bedplate sag is calculated as mentioned in the procedure above, and is to be submitted to the Engine / Propulsion maker by the shipyard. Once acceptance is received, the job can move forward.
Evaluation Of Bearing Reaction / Load
Various bearings being Loaded as intended by the design is the ultimate proof of the correctness of the alignment job. It is important to understand the method of measuring the bearing load and interpreting the same correctly for ensuring that the job is being done and evaluated correctly. In the coming paragraphs. the conducting of bearing load measurement is explained.
Alignment Verification – Jack Load Testing
Jack Load Testing or Jack-up method is one of the methods to verify shaft alignment. By lifting the shaft at certain specific points given in the alignment analysis report, the actual bearing loads can be calculated and verified against the values specified in the alignment analysis. It is a direct, simple, and widely used method. Using a suitable jack, shaft in way of a bearing is lifted hydraulically. The load experienced by the jack is measured directly using load cells or alternatively, the recorded hydraulic pressure is converted to equivalent load units. The jack is placed adjacent and close to shaft bearings as practically it cannot be placed at exact bearing locations. Initially, as part of the Shaft Alignment calculations, the location of the jack with respect to respective bearings. expected toad to be experienced by the jack and correction factors to be applied to jack loads to obtain the bearing reactions are determined and the same are to be followed during the jack load testing.
An arrangement for jack-up testing is shown in Figure 7(a) below. The rigidity of the bearing foundation and the surface on which the jack is placed should be as specified. Also, the dial gauge is to be anchored to a structure that is not affected by the jacking up activities.
Due to the unavoidable friction in the hydraulic jack, the hydraulic pressure corresponding to a specific load will be higher during lifting than during lowering. This phenomenon is referred to as “hysteresis” (an electrical engineering term). Therefore, the load is close to measured during both Lifting and lowering, and the corresponding curve is drawn. The correct (frictionless) curve is in the center between the 2 curves drawn. Refer to Fig 7(d)
Due to the hysteresis phenomenon, it is very important that the pressure is increased steadily during the “upwards” measurement and decreased steadily during the “downwards” measurement.
The plotted points are to be connected and normally several straight lines will occur with different slopes. See Fig. 7(c). Each time the slope changes it means that the support of the shaft system has changed.
Break Point:
- No 0: All the load is in the bearing and no load is in the hydraulic jack.
- No 1: All the load is now shifted to the jack and the bearing is fully released from the Load.
- No 2:The load in the jack is now so high that the second bearing is fully released from the toad.
- No 3: Represents the point in which the jacked journal has been lifted so high that the top clearance of the jacked bearing has been eliminated and the journal is now touching the upper shell of the bearing.
Line:
- No 1: There is load in the bearing and load in the hydraulic jack. With increasing pressure, the load is shifted from the bearing to the jack.
- No 2: With increasing pressure, the jack load is increased and simultaneously the second bearing with the load will start to be off-loaded.
- No 3: With increasing pressure, the jack load is increased and simultaneously the third bearing with Load will start to be off-loaded.
- No 4: With increasing pressure, the journal does not elevate much because the upper shell of the bearing prevents more lift.
Due to the internal friction in the hydraulic jack. there will be some difference between the corresponding values for increasing and decreasing Loads, i.e. the plotting will show two branches (hysteresis). Refer to Fig. 7 (c)
The jack load reaction (R) is the force that would be necessary to keep the shaft in its position if the bearing was not present.
In order to determine the reaction (R) two straight lines through the plotted points of the above-mentioned Line No 2 are to be drawn.
Analysis Line:
- No 1: This is a line through the increasing points of the above-mentioned line no 2.
- No 2: This is a line through the decreasing points of the above-mentioned line no 2.
- Analysis Line No 1 and analysis Line No 2 are to have approximately the same slope. Refer to Fig.7(b).
- (Ra) is the reaction of the Analysis Line No 1 at a lift of 0 mm
- (Rd) is the reaction of the Analysis Line No 2 at a Lift of mm
- The jack load reaction, Rj = 0.5 (Ra + Rd)
- The bearing reaction R is a little different from the Rj as the jack is not positioned at the center of the bearing. The Bearing reaction: R = C x Rj
For Installations With Gear Box
Once the gap and sag are cleared, shafting is coupled to the gearbox. Shafting between the gearbox and stern tube maybe with a single bearing or with multiple bearings. Temporary supports if any in addition to the pedestal bearings are removed.
Bearing reaction is measured for stern tube forward bearing, pedestal bearing/bearings, and the gearbox coupling end bearing. The template for the measurement of bearing reaction is the same as the one mentioned above.
Once all the bearing reactions are accepted. the installation is ready for chocking/Resin chocking
Once the gearbox is chocked/resin chocked and fixed. The engine is aligned to the input flange of the main engine. correcting angular and radial misalignment between the two. The limits of angular and radial misalignment are decided by the coupling employed to connect both together. In the aligned condition, crankshaft deflection of the main engine is also verified to be within limits as recommended by engine makers. At this stage, the engine is fixed using metallic/resin chocks.
Post chocking and tightening. the alignment and crankshaft deflection are re-verified and the engines are connected to the propulsion gearbox.
Alignment Of High-Speed Shafting
In some cases, the gearbox may be connected to the engine through a high-speed shafting with multiple intermediate pedestal bearings. In such cases. it is important to align all the bearings in a straight line prior to the installation of the high-speed shafting and coupling with the engine.
Acceptance of the jack loads, bedplate deflection, crankshaft deflection of the engine as applicable will mark the end of the alignment process. Various components like bearings, gearboxes, engines, etc can be fixed by chocking/resin chocking/ or by supporting devices like Vibracon or Rotochock,
Conclusion
This in short is the installation procedure of engine and propulsion systems onboard ships. There may be slight variations to the procedure, based on the shipyard’s experience and Propulsion system OEM’s requirements.
Now we will see the answer to questions mentioned at the beginning of the article
Should we re-sight the shaft line, when ships are being dry-docked for repairs?
Experience tells it is not required. unless there is a very definite indication of misalignment manifested during operation by excessive vibration, premature bearing failure, etc or there are serious mechanical damages. In this regard, it may also be noted that building the berth condition of a vessel cannot be replicated during future dry docking, and sighting may not give a conclusive answer. In case the shaft line has to be re-sighted, for reasons cited earlier, the methodology for the same is to be decided on a case to case basis, depending on the type and severity of the problem, and the repair yard’s experience in the matter.
How to re-align the shafting after the same is withdrawn for surveys?
There is no need to realign shafts when removed for surveys, most of the installations are coupled together with spigots and fitted bolts. Just connect back as original, and the system will be back to normal
What is the difference between gap-sag alignment and alignment using angular and radial misalignment?
Gap and sag alignment is basically carried out to Locate pedestal bearings, Engines (for directly coupled engines), gearbox, etc with respect to the tail shaft (Propeller shaft) forward end. Once these are located, shafts are coupled either using hydraulic couplings or with flanged joints with spigots and fit bolts. With the result, the angular and radial misalignment between shafting elements post coupling is zero. Alignment by correction of run out and face out (radial and angular misalignment), is carried out for installations coupled using a flexible coupling, capable of absorbing a certain amount of misalignment. Correction of misalignment, in this case, can be limited to the extent to which the intended coupling can absorb. In the coupled condition also, there is radial and angular misalignment between the components.
Is it important to do alignment in the middle of the night for accuracy?
It is not. Experience says that with the ambient temperature remaining nearly the same, it is ok if all critical alignment readings are done at the same time of the day, during the alignment period. However, in tropical conditions, it is preferred to do this well after sunset, as the hull will be in a better state of steadiness between Late night and sunrise.
References:
DNV Nauticus Software for Shaft whirling vibration and shaft alignment
Ship Structural Analysis and Design by Owen and Hughes
Engine alignment manuals, MAN B &W.
Authors:
Mr. Harikumar A,
Joint General Manager. Larsen & Toubro Shipyard, Chennaian active member of the Institute of Marine Engineers (India)
He has been working in the shipbuilding and repair industry since 1988. He started his career with Cochin Shipyard Limited, moved on to TEBMA SHIPYARDS, and currently works with L & T Shipbuilding Ltd. He is a graduate in engineering from Government Engineering College, Trichur. He was associated with the installation of propulsion systems of various classes of ships.
Mr. VenkataVara Prasaci Paila is a Marine Propulsion systems designer specialized in Shaft Alignment Design. In his 30 years experience, he added value to Indian Shipbuilding while drawing from 4 years overseas assignments including having worked on World’s Largest Pipe-Laying Vessel-“Solitaire”
Disclaimer: This post is not meant to be authoritative writing on the topic presented. thenavalarch bears no responsibility for the accuracy of this article, or for any incidents/losses arising due to the use of the information in this article in any operation. It is recommended to seek professional advice before executing any activity which draws on information mentioned in this post. All the figures, drawings, and pictures are property of thenavalarch except where indicated, and may not be copied or distributed without permission.
A simplified method of performing fatigue analysis of offshore structures
A simplified method of performing fatigue analysis of offshore structures Introduction An offshore structure is subject to environmental loads of waves, wind and current. By their nature, the resulting wave loads on the structure are cyclical. These cyclical...
How to use a ship’s hydrostatics to calculate its draft and trim
Introduction A ship’s hydrostatics, or hydrostats, is an oft used term in maritime parlance, and it refers to the characteristics when it is floating. What characteristics are these? How are these determined, and how can we read and understand them? Understanding...
Numerical integration methods for hull volume estimation
Introduction The hull of a ship is a complex 3D geometry, and finding out its simple properties like volume, centroid, etc. is not possible through simple formulae unlike standard shapes like cuboid or a cylinder. How do we find a property, say the volume of a...
How to do rule-based fitting calculations of a keyless propeller
Introduction A keyless propeller, as the name implies, requires no key for fastening the propeller on the cone of the propeller shaft. How is the torque then transferred to the propeller? The torque is transferred by the friction between the propeller and the...
Designing Fillet Welds for Symmetrical Joint Sections
Introduction Fillet welds are the most commonly used weld types in marine structures. A fillet weld is used when there are two pieces of metal that are joined perpendicular to each other or at an angle. In this article, we will explore how to select the right size...
Designing a stanchion/stopper for sea-fastening of deck cargo
Introduction Stanchions – a familiar term for mariners and ship designers. What are Stanchions? A stanchion is generally a vertical pipe or beam which is used to support some structural item or provide support rails on the deck. In ships, the most common type of...
Designing bolts for a joint connection
Introduction Bolts are very commonly used fastening items and used in a variety of configurations. In this article, we will explore in-depth the design of a bolt used in connecting two members at a joint (bolted joint). We'll see what properties of the bolt are...
Draft Surveys: Methodology, Calculations, and common errors
Introduction Marine transport is the backbone of the global trade and reasonably can be considered to be the artery of the global manufacturing supply chain, as more than four fifths of the world merchandise trade by volume is carried by sea. Undoubtfully, the...
The Bulbous Bow – types, characteristics, and effects
This is Part 2 of the two-part series on Bulbous Bows. For Part 1, click here By Tamal Mukherjee, *This article originally appeared in May 2019 edition of Marine Engineers Review (India), the Journal of Institute of Marine Engineers India. It is being...
Marine Propeller Shafting and Shafting Alignment – Part 1
*****This article first appeared in July 2018 edition of Marine Engineers' Review (MER), India. We're reproducing it for the readers of our blog***** Abstract: Since 2013, Shaft Alignment Practice has undergone a change, with developments of Analysis tools. At the...
Very good information
Shafting